SciELO - Scientific Electronic Library Online

 
vol.36 número4Langrangean decomposition applied to multiperiod planning of petroleum refineries under uncertainty índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

  • No hay articulos citadosCitado por SciELO

Links relacionados

  • No hay articulos similaresSimilares en SciELO

Compartir


Latin American applied research

versión impresa ISSN 0327-0793

Resumen

ZEBALLOS, L. J.  y  HENNING, G. P.. A CP approach to the scheduling of resource-constrained multiproduct continuous facilities. Lat. Am. appl. res. [online]. 2006, vol.36, n.4, pp.205-212. ISSN 0327-0793.

This contribution presents a new Constraint Programming (CP) formulation to address the optimal operation of multiproduct continuous processes. In particular, facilities having continuous stages, which manufacture intermediate or final products and a limited number of intermediate storage tanks, are tackled. The problem involves finding (i) the optimal sequence of production runs and (ii) the optimal agenda of usage of each storage tank. The proposed formulation is able to handle different features found in industrial environments such as dissimilar machines, sequence-dependent changeover times, forbidden campaign-machine assignments, production runs' length constraints, etc. Moreover, one of the main contributions of this paper is the handling of constrained resources of various types, such as intermediate storage tanks of limited capacity and qualified manpower required at some stages.

Palabras clave : Multiproduct Facilities; Renewable and Non-Renewable Resources; Constraint Programming.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons